Once I had the plan finalized I went to the basement and rechecked the measurements. Hmm, somehow I lost some space when I put up the new shelves. The carpet from the adjoining room comes into my space a bit too, something I hadn't really noticed before. I decided I'd use that as walking space. This takes a couple of feet off the width of the layout. I was planning on having 30" walkways all the way around, but now that wasn't going to happen. So I narrowed that to 20" and put it on only two sides, the left and the back. I laid down the tape using the original plan as much as possible. When I was done I remeasured the dimensions, then went back to the computer and redid the layout table. Then I modified the track layout to make it fit the new table. I still wasn't 100% positive, so i noted all the curve diameters and with a nail in a piece of wood, some string and a magic marker I went back down and laid out the curves on the floor. Everything fit! Cool beans. So next step is to start framing the table.
I used 1"x3"x8' pieces of lumber. No pressurized lumber, no fancy metal grid, this was low cost all the way. Using the tape as a guide I began cutting the wood to size. The beauty is that the dimensions need to be close but not exact. No need for laser markers and high tech tools. Just a table saw, a pencil, a measuring tape, drill and a right angle tool. Each corner got a pair of 2 1/2" screws. I'm going to do it in two halves, left and right. This way, when it comes time to put it up on legs, I can do it fairly easily. I was surprised at how easily and quickly the framing went together. Measure, cut, drill two small guide holes, drill in screws, done!
There isn't a need for extensive bracing work. The whole thing will be covered with a thin sheet of plywood, frmly nailed to the frame. This will give it plenty of rigidity. There will be just enough bracing to prevent sagging between the edge work.
Before I get the frame up on legs I need to install the new lights first. The photos you see make it look like there is more light than there really is. So, tomorrow it's off to Home Depot for the light fixtures, brackets and wiring.
Lighting installed! This will look much better. Wasn't very hard, I bought the ceiling box fixtures and they install between the joists with a few taps of the hammer. I kill the power and connect some #14 wire to an existing light fixture in the ceiling in the next room. I run the wire over to my new box and thread it through, connecting the ends to the fittings inside the power box in the fixture. The connections are easy- just strip the end of your wire and push each one into it's matching connector pin. So easy! Next I used a light fixture that installs even easier. Three lights took about an hour. Each light runs off a similiar light in the next room.
I framed out the two sections, called left & right. I simply followed the tape I had on the ground, cutting as I went. Two screws at each junction. Next I cut three 2x4's into six 39" legs. I drilled two hole through the leg and placed it on the inside of the frame, then I screwed on screw into place. Using a carpenter's square I made sure the leg was oriented 90 deg down, then screwed in the second screw. I did this all the way around, using six on the left side. I then braced each leg two ways, drilling holes and using more wood screws. Each time I made sure the leg was square, pointed straight down without and angle. Here is the left side with only a few more leg braces to install. When I was done the whole structure was surprisingly light yet quite strong and steady, no wobbling at all. The right side and plywood tops come next, later this week when more funds are available. It's actually inexpensive, but I still want to spread it out so I don't put a crimp in the wife's house budget.
Well the Christmas season is past and we're into the New Year, so time to start up again on the MCRR. I just last week finished the table. All the legs have 2x bracing now, and I used 1/4" plywood for the tabletop. The framework is strong, but the plywood adds further rigidity.
Now that the table is complete we can start adding roadbed. 16+ years ago when I first bought the house, I purchased a fair amount of flex-track, switches and corkbed. Now (finally!) I can start using them! Turns out I did a pretty bang up job of buying the right material. I have a vast amount of corkbed to work with, and enough flextrack to lay down the mainline and the first yard. I decided to keep the layout on one level for now, rather than go to two levels. I have room available to do that later without difficulty, but for now I'm following the KISS ("Keep It Simple Stupid") philosophy. Shown below I have started laying cork roadbed after first marking the basic mainline layout. I'm not held to a specific (rigid) design, so I can be flexible. All curves are 22" radius, with a couple being 24". Later I can add spurs with tighter radius as needed. The yard layout for now includes two sidings with a third siding that runs on the outside of the other two. This is for the engine shop. I have added two switches that will enable it to split into three lines.
(Below)
The north side of the layout. Here I plan to have most of the industry/town laid out. The main terminal will be on the left. The large books are used to hold the cork in place while the liquid nail glue dries. In the background is a great photo I had of 7 locomotives lined up. I hope to get several more like this and hang them along the back wall. The two shelves next to the picture will have to be moved, as they block the walkway behind the table.
(Below)
This is the entrance to the yard, looking south. Note the access aisle on the left between the wall and the table. Right now I am going to run two parallel sidings on the right, with a third that runs down to the locomotive shops. The second siding doesn't look parallel but that will be corrected (my first try, remember). On the locomotive spur it will split into three. I only had two spurs done here. Later, I might add another siding on the left side. The northbound mainline roadbed can be seen on the left.
Well the Christmas season is past and we're into the New Year, so time to start up again on the MCRR. I just last week finished the table. All the legs have 2x bracing now, and I used 1/4" plywood for the tabletop. The framework is strong, but the plywood adds further rigidity.
Now that the table is complete we can start adding roadbed. 16+ years ago when I first bought the house, I purchased a fair amount of flex-track, switches and corkbed. Now (finally!) I can start using them! Turns out I did a pretty bang up job of buying the right material. I have a vast amount of corkbed to work with, and enough flextrack to lay down the mainline and the first yard. I decided to keep the layout on one level for now, rather than go to two levels. I have room available to do that later without difficulty, but for now I'm following the KISS ("Keep It Simple Stupid") philosophy. Shown below I have started laying cork roadbed after first marking the basic mainline layout. I'm not held to a specific (rigid) design, so I can be flexible. All curves are 22" radius, with a couple being 24". Later I can add spurs with tighter radius as needed. The yard layout for now includes two sidings with a third siding that runs on the outside of the other two. This is for the engine shop. I have added two switches that will enable it to split into three lines.
(Below)
The north side of the layout. Here I plan to have most of the industry/town laid out. The main terminal will be on the left. The large books are used to hold the cork in place while the liquid nail glue dries. In the background is a great photo I had of 7 locomotives lined up. I hope to get several more like this and hang them along the back wall. The two shelves next to the picture will have to be moved, as they block the walkway behind the table.
(Below)
This is the south side of the layout. This area was originally intended for rural scenery, but I'll probably change that. Actually, I have friends who love trains but never had the time or room to do it. So I'm thinking of dividing this area up so each of my friends has an area he can create & develop using his own imagination. Share the fun, I say!
This is the entrance to the yard, looking south. Note the access aisle on the left between the wall and the table. Right now I am going to run two parallel sidings on the right, with a third that runs down to the locomotive shops. The second siding doesn't look parallel but that will be corrected (my first try, remember). On the locomotive spur it will split into three. I only had two spurs done here. Later, I might add another siding on the left side. The northbound mainline roadbed can be seen on the left.